4 Rotor Build in Sweden
#151
Now finally the production has begun for real ... I had never guessed that it would be so much preparation work on these. Do they look simple, but have been scratching my head once or three times ...
On top of all this, a revision of the CAM program take 5-15minutes of the heaviest pieces.
3st roughing 3D pockets from one direction is about 1500kb large program. Times the third Times two ...
Milling time, we will not even go into. It takes time
On top of all this, a revision of the CAM program take 5-15minutes of the heaviest pieces.
3st roughing 3D pockets from one direction is about 1500kb large program. Times the third Times two ...
Milling time, we will not even go into. It takes time