Rotary Engine Building, Porting & Swaps All you could ever want to know about rebuilding and porting your rotary engine! Discussions also on Water, Alcohol, Etc. Injection

6-Port full bridge

Thread Tools
 
Search this Thread
 
Old 06-24-2006, 10:45 AM
  #11  
Senior Member
Thread Starter
 
ChainSawOnSteroids's Avatar
 
Join Date: Jul 2002
Posts: 1,007
Default

Originally Posted by ArmyOfOne' post='825424' date='Jun 22 2006, 02:07 AM

Increased oil pressure and did Judge Ito's oil mods in the stickies section. And its still running the N/A oil pump not the Turbo II one.



I opened the port down and port matched a turbo II exhaust sleeve. Thats it!!


btw, i have the things inside my exhaust ports right? i need to grind them out?
ChainSawOnSteroids is offline  
Old 06-26-2006, 11:43 AM
  #12  
Senior Member
 
ArmyOfOne's Avatar
 
Join Date: Oct 2003
Location: Fort Lewis Washington
Posts: 705
Default

No just make it to where when you look through the exhaust port from the header side that you can not see the edge of the port. Flows nice and smooth and the ports open earlier yet have the same closing point as stock.
ArmyOfOne is offline  
Old 06-27-2006, 09:14 AM
  #13  
Senior Member
Thread Starter
 
ChainSawOnSteroids's Avatar
 
Join Date: Jul 2002
Posts: 1,007
Default

ok i think i got it
ChainSawOnSteroids is offline  
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
wildtony
2nd Generation Specific
0
08-07-2014 11:05 PM
TweakGames
Rotary Engine Building, Porting & Swaps
25
10-14-2007 12:10 AM
Node
Rotary Engine Building, Porting & Swaps
13
05-04-2006 01:39 AM
Bebirasta
Rotary Engine Building, Porting & Swaps
12
07-27-2003 05:46 PM
Bebirasta
2nd Generation Specific
0
07-21-2003 04:57 PM

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 


Quick Reply: 6-Port full bridge



All times are GMT -5. The time now is 12:28 AM.