work maximer F2, they were a custom order wheel from japan, as far as I know there is one set in the us (me) and one in PR.
They are actually built by stern, but for some reason work rebadged them. I have the stern centercaps.. -bobby |
Hmm...any way to give a percentage of completion on this project?
|
Originally Posted by Il RX8 lI' date='Feb 27 2005, 08:15 PM
knowing bobby, about 20% so far https://www.nopistons.com/forums/pub...#>/biggrin.png |
Well,
Now I am on MY schedule as far as working on the car is concerned. I still have a **** load of stuff to do, but I will work a lot faster then the fab guy does https://www.nopistons.com/forums/pub...IR#>/smile.png I'd say it is at about 65% done. The fabrication was the major chunk of the work that needed to be finished. The new PPF for the transmission still needs to be made, but that is "3 hours of work" according to kayo. Here is the List of things to do: Tear down motor and inspect Order rebuild kit order 10lbs wastegate springs from tial port intake and exhaust assemble motor install motor make s/s coolant lines (mabye) Install r1 oil coolers+ s/s lines GET THE TRANS! They are taking forever! Cut the trans tunnel for the shifter Take the car back to kayo's for the stainless steel torque arm install driveshaft tune... |
Originally Posted by rfreeman27' date='Feb 28 2005, 08:05 AM
Well,
Now I am on MY schedule as far as working on the car is concerned. I still have a **** load of stuff to do, but I will work a lot faster then the fab guy does https://www.nopistons.com/forums/pub...IR#>/smile.png I'd say it is at about 65% done. The fabrication was the major chunk of the work that needed to be finished. The new PPF for the transmission still needs to be made, but that is "3 hours of work" according to kayo. Here is the List of things to do: Tear down motor and inspect Order rebuild kit order 10lbs wastegate springs from tial port intake and exhaust assemble motor install motor make s/s coolant lines (mabye) Install r1 oil coolers+ s/s lines GET THE TRANS! They are taking forever! Cut the trans tunnel for the shifter Take the car back to kayo's for the stainless steel torque arm install driveshaft tune... So what trans are you using? The Jerico or the other? |
jerico
|
Tore the motor down Yesterday.
I need new rotor bearings :( but everything else looked cherry, should have it rebuild/ported by next week. -bobby |
Originally Posted by rfreeman27' date='Mar 2 2005, 04:26 PM
Tore the motor down Yesterday.
I need new rotor bearings :( but everything else looked cherry, should have it rebuild/ported by next week. -bobby Looking good, will love to se it personally once its done https://www.nopistons.com/forums/pub...1047683894.gif |
Thanks, where in MD do you live?
|
This weekend:
Port housings/irons, paint irons, cleannn everything! |