13BAce 06-20-2002 09:25 AM

The design looks to be better than the Mazda design:

http://www.hurley-engineering.ltd.uk/sidsealdig1.jpghttp://www.hurley-engineering.ltd.uk/sidsealdig2.jpg

http://www.hurley-engineering.ltd.uk/hme_r..._side_seals.htm

The stock Mazda seals get kind of brittle with age. I've had a few break with very little pressure while taking them out of rotors .

Shaolin Racing 06-20-2002 10:17 AM

Seems like it would be better because the round edges wont catch on any irregulars on the housing right?Since its a side seal there wouldnt be any detonation there so I cant really say it would take detonation any better.

dac 06-20-2002 10:29 AM

The only problem I see is that Raduised edge wearing down quicker. Mazda put 2mm rings in the GLC saying that they reduced friction (back in the mid 80's). These mazda GLC's needed a ring job at 50,000 miles.

13BAce 06-20-2002 11:17 AM


Originally Posted by Shaolin Racing' date='Jun 20 2002, 12:17 PM
Seems like it would be better because the round edges wont catch on any irregulars on the housing right?Since its a side seal there wouldnt be any detonation there so I cant really say it would take detonation any better.

Yeah, the stock seals don't like to encounter any irregularities.

13BAce 06-20-2002 11:17 AM


Originally Posted by dac' date='Jun 20 2002, 12:29 PM
The only problem I see is that Raduised edge wearing down quicker. Mazda put 2mm rings in the GLC saying that they reduced friction (back in the mid 80's). These mazda GLC's needed a ring job at 50,000 miles.

We'll see. I'll probably try them out in the next motor I build.

vosko 06-20-2002 12:44 PM

i rechecked my other engine. i think the old sidehousings can be resused so hard part list needed for the engine is two rotors and two rotor housings . got any lying around ? we can try those new hurleys on the spare engine https://www.nopistons.com/forums/pub...DIR#>/wink.png

13BAce 06-20-2002 12:53 PM


Originally Posted by vosko' date='Jun 20 2002, 02:44 PM
i rechecked my other engine. i think the old sidehousings can be resused so hard part list needed for the engine is two rotors and two rotor housings . got any lying around ? we can try those new hurleys on the spare engine https://www.nopistons.com/forums/pub...DIR#>/wink.png

I'll have some whenever I can get in touch with my friend. We're supposed to work out a trade.

vosko 06-20-2002 12:58 PM


Originally Posted by 13BAce' date='Jun 20 2002, 12:53 PM
[quote name='vosko' date='Jun 20 2002, 02:44 PM']i rechecked my other engine. i think the old sidehousings can be resused so hard part list needed for the engine is two rotors and two rotor housings . got any lying around ? we can try those new hurleys on the spare engine https://www.nopistons.com/forums/pub...DIR#>/wink.png

I'll have some whenever I can get in touch with my friend. We're supposed to work out a trade.[/quote]

sounds good to me. hmmm maybe i'll send the housings to RB to get lapped

13BAce 06-20-2002 01:20 PM


Originally Posted by vosko' date='Jun 20 2002, 02:58 PM
[quote name='13BAce' date='Jun 20 2002, 12:53 PM'][quote name='vosko' date='Jun 20 2002, 02:44 PM']i rechecked my other engine. i think the old sidehousings can be resused so hard part list needed for the engine is two rotors and two rotor housings . got any lying around ? we can try those new hurleys on the spare engine https://www.nopistons.com/forums/pub...DIR#>/wink.png

I'll have some whenever I can get in touch with my friend. We're supposed to work out a trade.[/quote]

sounds good to me. hmmm maybe i'll send the housings to RB to get lapped[/quote]

You can take out the stationary gears and rub the housings together using valve grinding compound.

vosko 06-20-2002 02:19 PM


Originally Posted by 13BAce' date='Jun 20 2002, 01:20 PM
[quote name='vosko' date='Jun 20 2002, 02:58 PM'][quote name='13BAce' date='Jun 20 2002, 12:53 PM'][quote name='vosko' date='Jun 20 2002, 02:44 PM']i rechecked my other engine. i think the old sidehousings can be resused so hard part list needed for the engine is two rotors and two rotor housings . got any lying around ? we can try those new hurleys on the spare engine https://www.nopistons.com/forums/pub...DIR#>/wink.png

I'll have some whenever I can get in touch with my friend. We're supposed to work out a trade.[/quote]

sounds good to me. hmmm maybe i'll send the housings to RB to get lapped[/quote]

You can take out the stationary gears and rub the housings together using valve grinding compound.[/quote]

i'll let you do that :P i might have found two 89 rotors + two 89 housings for $400 we'll see what happens. actually if its $400 i'm better off getting another jspec for $650 and selling the parts off this one