Had to replank the back deck today.
|
thats funny, I coulda swore you didn't mind the wood in your mouth?
|
i dunno that handy diff shipping setup you built was pretty cool, altho it took me forever to take the thing out cause i didnt feel like getting a power screwdriver out.
kevin. |
did it arrive in one piece?
|
|
Blind nailed is nice, blind screwed is better, blind screwed trex is forever..
|
|
I like working with wood.
Disclaimer: I know you guys will instantly commence with the gay wood jokes. |
I would recommend building/ borrowing, some dip tanks/troughs, and soaking the material, picketts and all in a mid-grade sealer for at least a week after all the cuts are made and such. Let the sealer penetrate really good, it will last much longer.
It's probably already installed though... |
Kind of hard to do that, especially since the boards are not trimmed until AFTER thay are installed
|
All times are GMT -5. The time now is 08:43 PM. |
© 2024 MH Sub I, LLC dba Internet Brands