Finally going to have the boat back together.....
#1
Eventually, lol for the past month I have had either the aft berth torn apart (for the new bed) or the forward berth torn apart (for the new airconditioning unit) So I pretty much have the a/c unit installed, still need to mount it, sort out the drain and make an intake for it, but I will have those done next week as far as re assembly goes I am already starting on that I don't need to have the other stuff done to do that.
Then I decided after buying a new circuit panel for the second shore power leg that it looked too damn nice next to the cheap junk yard one I put in last year....... so I am going to rip out the cheap panel and replace it with a nice Blue Sea panel.
Then I decided after buying a new circuit panel for the second shore power leg that it looked too damn nice next to the cheap junk yard one I put in last year....... so I am going to rip out the cheap panel and replace it with a nice Blue Sea panel.
#7
Originally Posted by Rob x-7' post='911336' date='Nov 8 2008, 01:19 PM
how many hobbs has this project taken you?
ehh, about 4 days i dont know how to convert unfortunately.
Damn yea I already ordered a new panel, it's cool though I got it for cost. Was a $350 panel for $138
#10
Originally Posted by phinsup' post='911337' date='Nov 8 2008, 11:57 AM
ehh, about 4 days i dont know how to convert unfortunately.
Damn yea I already ordered a new panel, it's cool though I got it for cost. Was a $350 panel for $138
Damn yea I already ordered a new panel, it's cool though I got it for cost. Was a $350 panel for $138
I was kinda hoping you'd say something like 4 score and 7 hobbs.
So what size dingy you got??