Ive got some work to do
#16
Oh yeah. It took me a total of about 2 weeks to do the swap the first time. If I had the engine, and hoist already here, **** that would be done in no time. Ive got to pay for this Haltech before I can order my engine.
#17
Originally Posted by TonyTurboII' date='Jul 1 2002, 05:11 PM
Oh, it can be done, and it will be done. Hopefully ill some of you at Sevenstock. Whos going?
#18
Originally Posted by 13BAce' date='Jul 1 2002, 10:03 PM
[quote name='TonyTurboII' date='Jul 1 2002, 05:11 PM']Oh, it can be done, and it will be done. Hopefully ill some of you at Sevenstock. Whos going?
Why not? Also, where do you think I should run the wires to my coils? I think it would be dumb sending them over the front of the engine with the rest.
Im thinking I might put my waterpump and intake back on so I can measure for the harness, and start cutting ****.
#20
Originally Posted by TonyTurboII' date='Jul 2 2002, 02:19 AM
[quote name='13BAce' date='Jul 1 2002, 10:03 PM'][quote name='TonyTurboII' date='Jul 1 2002, 05:11 PM']Oh, it can be done, and it will be done. Hopefully ill some of you at Sevenstock. Whos going?
Why not? Also, where do you think I should run the wires to my coils? I think it would be dumb sending them over the front of the engine with the rest.
Im thinking I might put my waterpump and intake back on so I can measure for the harness, and start cutting ****.[/quote]
I'm probably selling my engine and turbo. Measuring everything first is a good idea.