this is what im doing , 550 primaries 1000 secondaries
aeromotive fuel pump , and pressure regulator , kg fuel rails , sump tank -10 from the tank to the pump -8 from pump to fuel rail and return im missing the fittings and lines by Tuesday it most be done what ya think ?? |
nice. with the KG stuff you wanna pressurize it for leaks, maybe to like 70-80psi. i dont want to say anything bad, but fire is bad.
|
Originally Posted by j9fd3s' post='906192' date='Aug 9 2008, 10:40 PM
nice. with the KG stuff you wanna pressurize it for leaks, maybe to like 70-80psi. i dont want to say anything bad, but fire is bad.
yeap dont like much the way the Oring fit bout ill preassurize before fire it up |
progess
|
ohh i forgot about this
|
All times are GMT -5. The time now is 03:42 PM. |
© 2024 MH Sub I, LLC dba Internet Brands